- Jess***Jones
- 2026/04/17
Datasheets
THS4215DR.pdfTHS4215EVM Tech -specificaties
Texas Instruments - THS4215EVM Technische specificaties, attributen, parameters en onderdelen met vergelijkbare specificaties als Texas Instruments - THS4215EVM
| Productkenmerk | Attribuutwaarde | |
|---|---|---|
| Fabrikant | Texas Instruments | |
| Voltage - Supply, Single / Dual (±) | 5V ~ 15V, ±2.5V ~ 7.5V | |
| Gebruikt IC / Part | THS4215 | |
| geleverd Inhoud | Board(s) | |
| slew Rate | 970V/µs | |
| Serie | - | |
| Pakket | Bulk | |
| Output Type | Single-Ended |
| Productkenmerk | Attribuutwaarde | |
|---|---|---|
| Current - Supply (Main IC) | 19 mA | |
| Current - Output / Channel | 220 mA | |
| Channels per IC | 1 - Single | |
| Board Type | Fully Populated | |
| Base Productnummer | THS421 | |
| Amplifier Type | Voltage Feedback | |
| -3dB bandbreedte | 325 MHz |
| ATTRIBUUT | BESCHRIJVING |
|---|---|
| RoHs-status | Niet toepasbaar |
| Vochtgevoeligheidsniveau (MSL) | 1 (Unlimited) |
| Bereikstatus | REACH Unaffected |
| ECCN | EAR99 |
| HTSUS | 8473.30.1180 |
De drie delen aan de rechterkant hebben vergelijkbare specificaties als Texas Instruments THS4215EVM.
| Productkenmerk | ![]() |
|||
|---|---|---|---|---|
| Onderdeel nummer | THS4215EVM | THS4221DG4 | THS4215DGNRG4 | THS4215DRB |
| Fabrikant | Texas Instruments | Texas Instruments | Texas Instruments | Texas Instruments |
| Board Type | Fully Populated | - | - | - |
| Serie | - | - | - | - |
| Gebruikt IC / Part | THS4215 | - | - | - |
| Pakket | Bulk | Tube | Tape & Reel (TR) | Bulk |
| Output Type | Single-Ended | Rail-to-Rail | - | - |
| Current - Output / Channel | 220 mA | - | - | 220 mA |
| Voltage - Supply, Single / Dual (±) | 5V ~ 15V, ±2.5V ~ 7.5V | - | - | - |
| Amplifier Type | Voltage Feedback | Voltage Feedback | Voltage Feedback | Voltage Feedback |
| Base Productnummer | THS421 | THS422 | THS421 | - |
| slew Rate | 970V/µs | 990V/µs | 970V/µs | 970V/µs |
| Current - Supply (Main IC) | 19 mA | - | - | - |
| geleverd Inhoud | Board(s) | - | - | - |
| -3dB bandbreedte | 325 MHz | 230 MHz | 325 MHz | 325 MHz |
| Channels per IC | 1 - Single | - | - | - |
Download THS4215EVM PDF -datasheets en Texas Instruments -documentatie voor THS4215EVM - Texas Instruments.
THS4215DRBTexas InstrumentsIC VOLTAGE FEEDBACK 1 CIRC 8VSON
THS4221DGNTexas Instruments
THS4215DRG4Texas Instruments
THS4221DBVTTexas Instruments
THS4221DGKTexas Instruments
THS4215DRBRG4Texas InstrumentsUw e -mailadres wordt niet gepubliceerd.
| Gemeenschappelijke landen logistieke tijdreferentie | ||
|---|---|---|
| Regio | Land | Logistische tijd (dag) |
| Amerika | Verenigde Staten | 5 |
| Brazilië | 7 | |
| Europa | Duitsland | 5 |
| Verenigd Koninkrijk | 4 | |
| Italië | 5 | |
| Oceanië | Australië | 6 |
| Nieuw-Zeeland | 5 | |
| Azië | India | 4 |
| Japan | 4 | |
| Midden-Oosten | Israël | 6 |
| DHL & FedEx Verzendkosten Referentie | |
|---|---|
| Verzendkosten (kg) | Referentie DHL (USD $) |
| 0.00kg-1.00kg | USD$30.00 - USD$60.00 |
| 1.00kg-2.00kg | USD$40.00 - USD$80.00 |
| 2.00kg-3.00kg | USD$50.00 - USD$100.00 |
Wil je een betere prijs? Toevoegen aan CART en Dien nu RFQ in, we nemen onmiddellijk contact met u op.