Bekijk alles

Raadpleeg de Engelse versie als onze officiële versie.Opbrengst

Europa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Azië/Pacific
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, India en Midden -Oosten
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Zuid -Amerika / Oceanië
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Noord -Amerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
HuisproductenOntwikkelingsborden, Kits, ProgrammeursEvaluatieborden - Audio versterkersTAS5727EVM
TAS5727EVM Image
Afbeelding kan representatie zijn.
Zie specificaties voor productdetails.
EXPRESS -OPTIE
Betaalmethode

TAS5727EVM - Texas Instruments

Fabrikant Onderdeel nummer
TAS5727EVM
Fabrikant
Texas Instruments
Allelco Onderdeel nummer
98D-TAS5727EVM
Garantie
1 jaar Allelco -garantie - Lees meer
Onderdelenbeschrijving
EVAL MODULE FOR TAS5727
Pakket
Box
Data papier
-
Onze certificering
Op voorraad: 48000
  • Eenheid prijs: $308.307
  • Subtotaal: $0.00

Wil je een betere prijs?
Toevoegen aan CART en Dien nu RFQ in, we nemen onmiddellijk contact met u op.

Aantal stuks Eenheid prijs Ext.Prijs
1+ $308.307 $308.31
De bovenstaande prijzen omvatten geen belastingen en vrachttarieven, die op de bestelpagina's worden berekend.
EXPRESS -OPTIE
Betaalmethode
Onze certificering

bestek

TAS5727EVM Tech -specificaties
Texas Instruments - TAS5727EVM Technische specificaties, attributen, parameters en onderdelen met vergelijkbare specificaties als Texas Instruments - TAS5727EVM

Productkenmerk Attribuutwaarde  
Fabrikant Texas Instruments  
Voltage - Levering 8V ~ 26V  
Gebruikt IC / Part TAS5727  
geleverd Inhoud Board(s)  
Serie -  
Pakket Box  
Productkenmerk Attribuutwaarde  
Output Type 2-Channel (Stereo)  
Max Output Power x Channels @ Load 41.5W x 2 @ 4Ohm  
Board Type Fully Populated  
Base Productnummer TAS572  
Amplifier Type Class D  

Milieu- en exportclassificaties

ATTRIBUUT BESCHRIJVING
RoHs-status Niet toepasbaar
Vochtgevoeligheidsniveau (MSL) 1 (Unlimited)
Bereikstatus REACH Unaffected
ECCN EAR99
HTSUS 8473.30.1180

Onderdelen met vergelijkbare specificaties

De drie delen aan de rechterkant hebben vergelijkbare specificaties als Texas Instruments TAS5727EVM.

Productkenmerk TAS5727EVM TAS5729MDEVM TAS5731EVM TAS5727PHP
Onderdeel nummer TAS5727EVM TAS5729MDEVM TAS5731EVM TAS5727PHP
Fabrikant Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Base Productnummer TAS572 TAS5729 TAS573 -
geleverd Inhoud Board(s) Board(s) Board(s) -
Output Type 2-Channel (Stereo) 1-Channel (Mono) or 2-Channel (Stereo) 2-Channel (Stereo) with Subwoofer -
Voltage - Levering 8V ~ 26V - 8V ~ 26V -
Board Type Fully Populated Fully Populated Fully Populated -
Pakket Box Box Box -
Amplifier Type Class D Class D Class D -
Max Output Power x Channels @ Load 41.5W x 2 @ 4Ohm - 41.5W x 1 @ 4Ohm; 20.9W x 2 @ 8Ohm -
Gebruikt IC / Part TAS5727 TAS5729MD TAS5731 -
Serie - DirectPath™ - -

klanten-reviews

Evaluatie: 10 -artikelen

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Schrijf een recensie

Uw e -mailadres wordt niet gepubliceerd.

Verzending

Aflevertijd

In de voorraad kunnen items binnen 24 uur worden verzonden.Sommige onderdelen worden georganiseerd voor levering binnen 1-2 dagen na de datum Alle items komen aan ons magazijn aan.En Allelco -schepen bestellen eenmaal per dag om ongeveer 17:00, behalve zondag.Zodra de goederen zijn verzonden, is de geschatte levertijd afhankelijk van de verzendmethoden en de leveringsbestemming.De onderstaande tabel is de logistieke tijd voor sommige gemeenschappelijke landen.

Deliveringskosten

  1. Gebruik uw uitdrukkingsaccount voor verzending als u er een hebt.
  2. Gebruik ons account voor de verzending.Raadpleeg de onderstaande tabel voor de geschatte kosten.
(Verschillende tijdsbestek / landen / pakketgrootte heeft een andere prijs.)

Leveringsmethode

  1. Wereldwijde gemeenschappelijke verzending door DHL / UPS / FEDEX / TNT / EMS / SF die we ondersteunen.
  2. Anderen meer verzendings manieren, neem contact op met uw klantmanager.

Gemeenschappelijke landen logistieke tijdreferentie
Regio Land Logistische tijd (dag)
Amerika Verenigde Staten 5
Brazilië 7
Europa Duitsland 5
Verenigd Koninkrijk 4
Italië 5
Oceanië Australië 6
Nieuw-Zeeland 5
Azië India 4
Japan 4
Midden-Oosten Israël 6
DHL & FedEx Verzendkosten Referentie
Verzendkosten (kg) Referentie DHL (USD $)
0.00kg-1.00kg USD$30.00 - USD$60.00
1.00kg-2.00kg USD$40.00 - USD$80.00
2.00kg-3.00kg USD$50.00 - USD$100.00
Opmerking:
De bovenstaande tabel is alleen ter referentie.Er kan enige gegevensvooroordeel hebben voor de oncontroleerbare factoren.
Neem contact met ons op als u vragen heeft.

Betalingssteun

De betaalmethode kan worden gekozen uit de hieronder getoonde methoden: draadoverdracht (T/T, bankoverdracht), Western Union, creditcard, PayPal.

Uw trouwe supply chain -partner -

Neem contact met ons op als u vragen heeft.

  1. Telefoon
    +00852 9146 4856

Certificeringen en lidmaatschappen

Bekijk meer
TAS5727EVM Image

TAS5727EVM

Texas Instruments
98D-TAS5727EVM

Wil je een betere prijs? Toevoegen aan CART en Dien nu RFQ in, we nemen onmiddellijk contact met u op.

0 RFQ
Winkelmand (0 Items)
Het is leeg.
Vergelijk lijst (0 Items)
Het is leeg.
Feedback

Uw feedback is belangrijk!Bij Allelco waarderen we de gebruikerservaring en streven we ernaar deze constant te verbeteren.
Deel uw opmerkingen met ons via ons feedbackformulier en we zullen onmiddellijk reageren.
Bedankt voor het kiezen van Allelco.

Onderwerp
E-mail
Comments
Captcha
Sleep of klik om het bestand te uploaden
Upload bestand
Typen: .xls, .xlsx, .doc, .Docx, .jpg, .png en .pdf.
MAX -bestandsgrootte: 10 MB